Top Navigation

Case Studies – Air Quality

Archive | Case Studies – Air Quality

South Lambeth Phase 1, London Borough of Lambeth AQ Screening, AQDMP and AQ Neutral

This project was for the construction of one residential block in the first phase of the South Lambeth Estate residential development. The site is within the borough-wide London Borough of Lambeth (LBL) Air Quality Management Area (AQMA); this AQMA was defined for 1-hour and annual mean exceedances of NO2 and for 24-hour and annual mean […]

Continue Reading

Stanley Dock , Liverpool

This project was for the construction of a multi-storey car park for the new cruise terminal at Stanley Dock. The site is located on the busy A565 Great Howard Street within an Air Quality Management Area (AQMA). The additional exhaust emissions from development-generated traffic, and heavy-goods vehicles (HGVs) during the construction phase, have the potential […]

Continue Reading

Gillette Corner, London

The proposed development was for the construction of a mixed-use scheme made up of serviced office space and self-storage, on a former petrol filling station located in West London. This location is urban, and the development is situated on the corner of a main commuting route; the A4 Great West Road, and Syon Lane, both […]

Continue Reading

Megaloughton Lane, Derby

Construction of a proposed warehouse and distribution facility to the south of the A52 roundabout in Spondon. The proposed development is very near to this roundabout, with the roundabout being part of a complex road system including the A52 and A6005 as well as their accompanying slip roads. With a large number of sensitive residential […]

Continue Reading
Top