Monitoring case study

HS2 Enabling Works – Euston

Background

Since 2019, we have been providing Skanska Construction UK Ltd. with technical noise and vibration support for their enabling works at Euston, preparing the existing station for HS2.

Challenge

Our work includes noise monitoring at track side positions and at numerous locations within train stations. We are currently maintaining 25 monitoring positions within Euston station, including platforms, office, and retail spaces. Our work on this project has been ongoing since 2016 and we are pleased to continue to offer our services moving forwards.

Solution

We have built up a relationship with Camden Borough Council on the behalf of our client to gain permission to install noise monitors on lamp-posts; enabling us to capture data at locations nearby trackside works that would otherwise be impossible.

A quick turnaround on the supply of additional monitors as required is critical for this project. We are proud to be able to satisfy our clients in this regard, often deploying engineers to site next day.